在线成人www免费观看视频,日韩手机专区 1页,天天爽爽夜夜爽爽视频小视频,亚洲欧美成人a∨观看,国产性猛交╳XXX乱大交视频

 
          其它欄目
          聯(lián)系我們
河北申工縫紉機(jī)制造有限公司
地址:河北省青縣盤古鎮(zhèn)堤下頭工業(yè)園區(qū)
電話:0317-4162998
傳真:0317-4261031
網(wǎng)址:www.www.whlqj.cn
郵箱:shengongfr@126.com
郵編:062650
 當(dāng)前位置:首頁 - 其他內(nèi)容 - 技術(shù)文檔
 
  Use and Repair of Canvas Sewing Machine  
     
更新時間:2008.09.07 瀏覽次數(shù):
 

1.Hooking-thread time adjustment of the swinging shuttle

  The position relationship of needles and swinging shuttle affects hooking thread directly. The correct position relationship shall accord to three aspects as follows:

1.  When the needle moves to the lowest position, the space between hooking thread tip and the needle, named thread hooking space, should be 6-7 mm (shown in Fig. 1). The thread hooking space of GB4-1 is achieved by adjusting the crank of the lower shaft fixing screw and changing the relative position between lower crank and swinging shuttle pad. To ensure the permanent space in long-term operation, a hole was drilled to assembly fixing pin, so customers needn’t adjust the space in using.

            (圖勾線距)后面的是圖片的名稱別刪Hooking thread space

2.When the hooking tip of swinging shuttle moves to the center line of the needle, the distance of shuttle tip to upper edge of needle thread hole should be 2-2.5 mm. (shown in Fig. 2)

(圖梭尖與機(jī)針孔)后面的是圖片的名稱別刪Shuttle Tip and Needle Hole

If the position of the needle is overmuch high, it can easily pull the thread ring away and the thread hooking can’t be achieved, thus causing skipping thread stitch. On the other wise, if the shuttle tip comes to hooking thread position before the thread ring is thrown out, the thread ring may be broken, thus cause broken thread.

 

The method of adjustment is to open thread-picking side cover, use a screwdriver to loosen the needle bar connecting shaft screw, move the needle bar to the correct position mentioned above and then tighten the connecting needle bar shaft screw. (shown in Fig. 3)

(圖 針桿高度調(diào)整)后面的是圖片的名稱別刪Adjustment of the height of the needle bar

3.The distance between the shuttle tip surface and the needle

(圖梭尖平面與機(jī)針間隙)后面的是圖片的名稱別刪Adjustment of the distance between the shuttle tip surface and needle

  When the swing shuttle tip moves to the needle center, the distance between the shuttle tip surface and needle shall be 0.05-0.25mm( shown in Fig.4).

  If the distance is too big, it is hard for the shuttle tip to accurately hook the thread ring, causing jumping thread. If it is too small, the shuttle tip may crash onto the needle and break needles.

   Adjustment method: Open the needle plate, lay the machine head flat, and loosen the shuttle bed base fixing screw 1 and lower shaft block ring screw 2 by a screwdriver. Then adjust the shaft direction position of the shuttle bed base and the distance between the swing shuttle tip surface and the needle is made 0.05-0.25mm. Then tighten the shuttle bed base fixing screw 1 and make the lower shaft block ring and he shuttle bed base back part get closer and later tighten block ring tightening screw 2(“shown in Fig.5)梭尖平面與機(jī)針間隙調(diào)整

 

Copyright 2011-2012 河北申工縫紉機(jī)制造有限公司 All rights reserved. 冀ICP備10014943號-3
地址:河北省青縣盤古鎮(zhèn)堤下頭工業(yè)園區(qū) 電話:0317-4162998 傳真:0317-4261031
郵箱:shengongfr@126.com 郵編:062650 網(wǎng)址:www.www.whlqj.cn